Trafo Elettro has supplied n.8 cast resin transformers to one of the largest PVC production facilities in Europe, with 420,000 tonnes a year of material supplied to key sectors such as building, automotive and piping.

The aim of our customer is to increase the PVC production.

N.6 cast resin transformers

Power: 2500kVA
Primary voltage volt: 6000 ±2×2,5%
Secondary voltage at no load volt: 690+n
Vector group: Dyn5
Windings material: Copper
Enclosure: IP33
Class: C5-M

N.2 cast resin transformers

Power: 500kVA
Primary voltage volt: 690 ±2×3,33%
Secondary voltage at no load volt: 400+n
Vector group: Dyn5
Windings material: Copper
Enclosure: IP23
Class: C5-M