Waste-to-energy plant

Waste-to-energy plant

Trafo Elettro supplied n.1 oil transformer 10/13MVA to the new waste-to-energy plant in Parona (PV) – Italy, for the construction of a new, more efficient and less environmental impact, line that will replace the existing one built on 1999.

The transformer has the following technical characteristics:

Power: 10000/13000kVA ONAN/ONAF
Primary voltage volt: 11000 ±5×1,25% OLTC
Secondary voltage at no load volt: 6000
Vector group: Dyn11

This transformer is equipped with special accessories like online gas monitoring device and maintenance free silicagel breather. The design was specifically studied in order to meet customer needs.